Risk Management - A Basic Understanding



Literally speaking, risk management is the process of minimizing or mitigating the risk. It starts with the identification and evaluation of risk followed by optimal use of resources to monitor and minimize the same.
Risk generally results from uncertainty. In organizations this risk can come from uncertainty in the market place (demand, supply and Stock market), failure of projects, accidents, natural disasters etc. There are different tools to deal with the same depending upon the kind of risk.
Ideally in risk management, a risk prioritization process is followed in which those risks that pose the threat of great loss and have great probability of occurrence are dealt with first. Refer to table below:
IMPACT
ACTIONS
SIGNIFICANT
Considerable Management Required
Must Manage and Monitor Risks
Extensive Management essential
MODERATE
Risk are bearable to certain extent
Management effort worthwhile
Management effort required
MINOR
Accept Risks
Accept but monitor Risks
Manage and Monitor Risks

LOW
MEDIUM
HIGH
LIKELIHOOD
The above chart can be used to strategize in various situations. The two factors that govern the action required are the probability of occurrence and the impact of the risk. For example a condition where the impact is minor and the probability of occurrence is low, it is better to accept the risk without any interventions. A condition where the likelihood is high and the impact is significant, extensive management is required. This is how a certain priority can be established in dealing with the risk.
Apart from this, typically most of the organizations follow a risk management cycle. Refer diagram below:
According to this cycle there are four steps in the process of risk management. The first step is the assessment of risk, followed by evaluation and management of the same. The last step is measuring the impact.
Risk identification can start at the base or the surface level, in the former case the source of problems is identified. We now have two things to deal with the source and the problem.

Risk Source: The source can be either internal or external to the system. External sources are beyond control whereas internal sources can be controlled to a certain extent. For example, the amount of rainfall, weather over an airport etc!

Problem: A problem at the surface level could be the threat of accident and casualty at the plant, a fire incident etc.
When any or both of the above two are known beforehand, certain steps can be taken to deal with the same.
After the risk/s has been identified then it/they must be assessed on the potential of criticality. Here we arrive upon risk prioritization. In generic terms ‘likelihood of occurrence × impact’ is equal to risk.

This is followed by development of a risk management plan and implementation of the same. It comprises of the effective security controls and control mechanisms for mitigation of risk.
A more challenging risk to organizational effectiveness is the risk that is present but cannot be identified. For example a perpetual inefficiency in the production process accumulates over a certain period of time and translates into operational risk.